A. General

Whenever a Critical Payment System (CPS) transaction is input, electronic or paper documentation output is generated to the processing center (PC). The receipt of the documentation is the first notification to the PC that the critical case procedures have been invoked by the field office (FO). The output displays payment and other identifying information about the critical case.

B. CPS Output

When reviewing the output, if payment has been initiated under a number other than the claim number, use other means of identifying the correct claim number (e. g. Representative Payee System, etc.) If this does not produce the proper claim number, e-mail or call the FO and ascertain the correct claim number. When the correct claim number is located, process a transfer payment action within CPS in I-MAIN.

If the FO records reflect the same claim number as originally input, request the FO to contact the beneficiary to verify the claim number. If the claim is lost, redevelop under the lost claim procedure. If jurisdiction belongs to another PC, process a CPS correction action to change the output disposition indicator (ODI) to the appropriate PC.

Review the CPS output to determine the state of processing. When a claims or post-entitlement action is required, make sure that the corrective action is taken promptly and that the CPS ACR is maintained until the appropriate action has been taken to adjust or clear the pending CPS.

If it is determined, based upon the review, that the beneficiary is not entitled to benefits, immediately process a manual CPS stop-payment and control recovery of any overpayment etc. Clear the CPS record by submitting it to vHelp for manual clearance.

When a future suspension or termination of benefits is applicable (e.g., age 18, no child under 16, etc.), determine if the correct last payment month (LPM) was input on the CPS transaction. If not, prepare a diary hold to control the case for the first of the month before the month of suspension or termination. When the diary matures, process a MADCAP/MCS/CCE conditional adjustment. If a MADCAP/MCS action cannot be processed when the diary matures, process a manual CPS stop-payment action (If the correct LPM was input, a diary is not necessary because the CPS payments will stop automatically.)

Whenever a CPS payment is made to replace an overpayment benefit withholding, the field office will annotate the nature of problem field (NPF) with the remark O/P INVOLVED-PSC ACTION REQUIRED. This remark alerts the PSC that action is needed to adjust the ROAR overpayment amount. All existing instructions regarding overpayments are applicable.

Whenever a MADCAP/CPS/MCS/CCE interface results in the posting of an overpayment to the MBR, existing instructions regarding overpayments are applicable. Notify the beneficiary of the overpayment, and include reconsideration/waiver rights, etc.

When a MADCAP/MCS/CCE corrective action is applicable, examine the CPS payee name and address (PNA) carefully. If the CPS PNA is different than the MBR data, be sure to enter the correct PNA on the MADCAP/MCS action.

C. When CPS is Paid for a Nonreceipt Month

When a CPS payment was issued because the beneficiary alleged a regular MBR payment was not received, ensure that non-receipt or a stop payment action has been taken on the missing payment in accordance with appropriate sections in GN 02406.000 and GN 02408.000.


To Link to this section - Use this URL:
http://policy.ssa.gov/poms.nsf/lnx/0302803250
RS 02803.250 - Processing Center Action when the Critical Payment System (CPS) Is Used - 11/19/2026
Batch run: 11/19/2026
Rev:11/19/2026