TN 24 (09-02)
If the RIB MBA with DRCs exceeds the B MBA or B original rate, but the RIB PIA without DRCs does not exceed the B original rates, suspend the B benefit for technical entitlement.
If the RIB MBA with DRCs exceeds the widow(er) MBA, but not the WIB PIA, suspend for technical entitlement.
If the RIB MBA with DRCs exceeds both the widow(er) MBA and PIA, terminate widow(er) benefits.